Home Page » Realisation

Realisation

From the standpoint of urban planning solutions the production area is made up of individual production, operational, storage and auxiliary parts to sustain the optimal technological flow of production, to minimize the spacing between adjacent buildings, while making sure that the nature of the construction as a whole will have as little impact on the environment as possible.

The area will be made accessible to the public by using the reconstructed and enlarged road on the southern side. Besides the technical and technological requirements the design shall also comply with all requirements concerning the preservation of monuments and nature preservation to save the watchtower of the stronghold located in the south-eastern corner of the land, as well as any building facing the eastern side of the manor, where the old barn in particular is valuable from a structural and historical point of view. To take these facts into account the area has been divided into three individual operational and service sections.

Kód a administrační systém pro tyto www stránky byly vytvořeny ve VM-Systems.